Waynesburg Boro

sewer Plant

Waynesburg Borough Sewer Plant

Located at Meadowlark Park Road
Hours: 7:00am- 3:00pm
(Sunday through Saturday)
(724) 627-5406

Waynesburg Borough completed construction of the primary wastewater Treatment Plant in 1942. The plant was upgraded to secondary treatment in 1957. In 1990 the plant was again renovated and upgraded to “Enhanced Secondary” wastewater treatment.

Acting Superintendent:

Dave Bedilion

Crew:

Dave Beiter
Cody Smith
Joe Ealy

Engineering:

Gannett Fleming
Foster Plaza III Suite 200
601 Holiday Drive
Pittsburgh, PA 15220

412-922-5575
Fax: 412-992-3717