Located at Meadowlark Park Road Hours: 7:00am- 3:00pm (Sunday through Saturday) (724) 627-5406
Waynesburg Borough completed construction of the primary wastewater Treatment Plant in 1942. The plant was upgraded to secondary treatment in 1957. In 1990 the plant was again renovated and upgraded to “Enhanced Secondary” wastewater treatment.
Acting Superintendent:
Dave Bedilion
Crew:
Dave Beiter Cody Smith Joe Ealy
Engineering:
Gannett Fleming Foster Plaza III Suite 200 601 Holiday Drive Pittsburgh, PA 15220